;
Garage Door Handbook

Florida Lifetime Impact Window & Door Inc

Tampa Bay Area

  • Rating
    85

    0Angi: A
  • Is this your business? Claim Here

  • Address

  • Contact

Featured Reviews

  • Review from Lou M.

    Angi5

    Start to finish and final inspection the job was done very well. Sales Representative, office staff, technicians and installers were all professional and courteous. The technicians installing the windows and doors were very knowledgeable and professional and the project was completed without any delaying incidents. There was one item on which a call back was required - the local building inspector required that additional fasteners in the door frames be installed in the thickest part of the door frame. The original fasteners were sufficient but the inspector said that the local preference was to install them as he recommended. The company was very responsive and within a week had a technician on site to install the additional fasteners. I was very pleased with the quality of the work and would recommend Florida Lifetime Impact Window & Door Inc to anyone considering having impact windows and doors installed in their home or business. Services Rendered: Replaced 13 existing windows with Gorell Armor Max Plus wind and impact resistant windows. 8 double hung opening windows, 3 picture windows, and 2 slider windows. Replaced 3 egress doors with wind and impact resistant doors. Main entry door with impact glass decorative opening. Side Garage door with impact half window containing internal mini blindt. Patio door with impact full window containing internal mini blind.

  • Review from LINDA S.

    Angi5

    I had someone install a door previously, about six years ago, and it has been giving me problems. This door was done properly, I don't foresee any problems with it. Services Rendered: Replaced an exisiting door, installed a door properly

  • Review from Jeffrey I.

    Angi5

    From the initial meeting with the Sales Manager Fred, to both crews that performed the work requested; this was a professional quality company from start to finish. The old patio doors that were replaced were not installed by the original owner correctly, but that did not deter Johnny or Bryan (the sliding door crew) from solving the uncovered issues and then consulting with me on what needed to be accomplished. They were true professionals. The quality of the Gorell windows can only be truly appreciated when installed. Fred had already covered any corrections that may be needed in our multiple meetings before the jobs began.The garage doors were installed without a hitch due to both the quality of the Dalton product and the meticulous installation of Tom and Doug (the garage door crew). Both jobs were finished in the agreed upon time frame. It is a pleasure to deal with such conscientious, quality driven, professionals. I also had several conversations with Ken and Mike (owner) from the main office as they were patient and detailed in answering all my questions before, during and after the job. I have more remodeling to do and will use this company (Florida Lifetime) in any and all aspects that they are available to do the work. Services Rendered: Replaced two outside patio door sliders (8’x6.5’ each) with Gorell Sliders (6400 Series) and replaced two single garage doors (9’x7’) with Wayne Dalton (8500 series) garage doors.

Frequently Asked Questions